Awalé Hits 45.7 g/t Gold over 32m at the Odienné Project

HIGHLIGHTS

  • 26 g/t gold over 57m, 1487 gram meters gold from 164m downhole in OEDD-83

  • Mineralization is consistently high grade throughout the reported interval

  • One of the highest-grade gold intersections in Africa in decades

  • A follow-up drill program is scheduled to begin in April, with 25,000 meters planned for 2024

Vancouver, British Columbia–(Newsfile Corp. – March 25, 2024) – Awalé Resources Limited (TSXV: ARIC) (the “Company” or “Awalé”) is delighted to report outstanding assay results at the Odienné Project of 45.7 g/t gold over 32m from a new breccia pipe at the Charger target.

Andrew Chubb CEO of Awale Resources commented today,

“This drill hole is absolutely spectacular. I have been looking at gold projects for the last 20 years and have never seen anything like this. Odienné has produced very high-grade mineralization since we started drilling, though we always felt that…



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.